韩国漂亮人妻被中出中文字幕,91在线精品专区,AV中文无码乱人伦在线,国产国拍亚洲精品午夜不卡17 ,狠狠色丁香婷婷综合久久来来去,国产精品成人VA久久久久一级毛片

當前位置:首頁-新聞資訊

強風預襲工商業(yè)屋頂光伏該怎么保障安全

發(fā)布時間:2025-04-18 發(fā)布人:天合·種電 發(fā)布來源:http://www.lucksun-home.cn/

首先是在強風來臨前,對光伏電站進行全面的緊固和加固工作??梢允褂描F絲、繩索等對組件支架進行捆綁,增加其穩(wěn)定性。對于配重不足的電站,可使用沙袋等增加配重,以抵抗強風的作用力。檢查光伏電站的各個電氣設備狀態(tài)以及絕緣密封性,若密封狀態(tài)差則需及時處理。對關鍵電氣節(jié)點,如直流接線、交流接線等處需重點排查,確保在強風天氣下不會因線路松動等問題引發(fā)安全事故。同時,關閉逆變器直流開關和交流配電箱匯流箱的斷路器,防止強風引發(fā)的電氣故障。密切關注氣象部門發(fā)布的天氣預報和災害預警信息,及時了解強風的強度、路徑和預計到達時間等信息。根據(jù)氣象信息,提前做好應急準備工作,如組織人員、準備應急物資等。

Firstly, comprehensive fastening and reinforcement work should be carried out on the photovoltaic power station before strong winds approach. Iron wire, ropes, etc. can be used to bind the component bracket to increase its stability. For power stations with insufficient counterweight, sandbags can be used to increase the counterweight to resist the force of strong winds. Check the status and insulation sealing of various electrical equipment in the photovoltaic power station. If the sealing condition is poor, it needs to be dealt with in a timely manner. Key electrical nodes, such as DC and AC connections, need to be carefully inspected to ensure that safety accidents are not caused by loose wiring during strong wind weather. At the same time, turn off the DC switch of the inverter and the circuit breaker of the AC distribution box combiner box to prevent electrical faults caused by strong winds. Pay close attention to the weather forecast and disaster warning information released by the meteorological department, and timely understand the strength, path, and expected arrival time of strong winds. Based on meteorological information, make emergency preparations in advance, such as organizing personnel and preparing emergency supplies.

再是全面梳理電站的保險情況,查看保險合同是否仍在有效期內,確認保險范圍是否涵蓋風暴等極端天氣造成的損失。有些電站可能會因為各種原因無意中脫保,例如保費支付疏忽、保險合同到期未及時續(xù)保等。對于發(fā)現(xiàn)的脫保情況,要盡快與保險公司聯(lián)系,商討續(xù)?;蛑匦峦侗J乱?。同時,仔細核對保險條款,明確理賠流程和所需材料,確保在遭受風暴損失后能夠順利獲得理賠。

Furthermore, comprehensively review the insurance situation of the power station, check whether the insurance contract is still valid, and confirm whether the insurance coverage covers losses caused by extreme weather such as storms. Some power stations may unintentionally become uninsured due to various reasons, such as negligence in premium payment, failure to renew insurance contracts in a timely manner upon expiration, etc. For any discovered cases of insurance withdrawal, it is necessary to contact the insurance company as soon as possible to discuss renewal or re insurance matters. At the same time, carefully check the insurance terms, clarify the claims process and required materials, and ensure that claims can be obtained smoothly after suffering storm losses.

20221206031006955_02

重要的是強風天氣下,安排人員對電站進行值守時,值守人員要確保自身安全,盡量避免在戶外長時間停留,可結合電站視頻監(jiān)控系統(tǒng)對電站情況進行監(jiān)視。如遇緊急情況,應及時按照預先制定的人員疏散、撤離計劃進行行動。保持對光伏電站設備的運行監(jiān)控,密切關注設備的各項參數(shù)和運行狀態(tài)。如果發(fā)現(xiàn)設備出現(xiàn)異常情況,如組件電壓、電流突然變化等,應及時記錄相關數(shù)據(jù),并在風暴過后進行詳細檢查和分析。

It is important to arrange personnel to be on duty at the power station during strong wind weather. The on duty personnel should ensure their own safety and try to avoid staying outdoors for a long time. The power station's situation can be monitored through the power station's video surveillance system. In case of emergency, actions should be taken promptly according to the pre established personnel evacuation and evacuation plan. Maintain operational monitoring of photovoltaic power plant equipment, closely monitor various parameters and operating status of the equipment. If any abnormal situations are found in the equipment, such as sudden changes in component voltage or current, relevant data should be recorded in a timely manner, and detailed inspection and analysis should be carried out after the storm.

當強風過后,氣候、環(huán)境條件滿足安全要求時,及時到現(xiàn)場對光伏電站進行全面檢查。檢查組件是否有破損、隱裂,支架是否變形、松動,電氣設備是否受損等。對受損的設備和設施進行詳細記錄,以便后續(xù)進行維修和更換。

When strong winds pass and the climate and environmental conditions meet safety requirements, promptly conduct a comprehensive inspection of the photovoltaic power station on site. Check whether the components are damaged or cracked, whether the brackets are deformed or loose, and whether the electrical equipment is damaged. Record in detail the damaged equipment and facilities for subsequent repair and replacement.

本文由工商業(yè)屋頂光伏友情奉獻.更多有關的知識請點擊:http://www.lucksun-home.cn我們將會對您提出的疑問進行詳細的解答,歡迎您登錄網站留言.

This article is dedicated to friendship For more information, please click: We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

  • TEL:0531-82390078
  • TEL:18805312017
  • MAI:sdzdny001@163.com

掃一掃方便咨詢我們

截屏,微信識別二維碼

微信號:18805312017

扎鲁特旗| 扶绥县| 忻城县| 宜宾县| 鄂伦春自治旗| 慈溪市| 广南县| 清水县| 岱山县| 开化县| 绥江县| 天镇县| 武清区| 盖州市| 若尔盖县| 西安市| 司法| 化隆|